COMPLETED PROJECTS

 

McKinney National Airport Air Traffic Control Tower – Tandem Consulting, LLC performed Owner Representative Services for the New 8 level Replacement Tower completed in 2011.  The project was funded in part by TxDOT Aviation at a cost of $1,875,000.00

Mesquite Metro Airport Air Traffic Control Tower – Tandem Consulting, LLC performed Owner Representative Services for the New 8 level Tower completed in 2014.  The project was funded in part by TxDOT Aviation at a cost of $2,013,000.00

Hopkins County Veterans Memorial – Tandem Consulting, LLC worked with the HCVM Committee from design through construction.  Serving as Construction Manager Agent.  The project was completed in 2012 at a cost of $1,000,000.00
 

City of Sulphur Springs OSP Fiber Network – First phase design and Project Management of MAN connecting City Hall, PD and Business Office and multiple remote enclosures for Downtown.
 

Sulphur Springs City Hall - Technology Infrastructure – Tandem Consulting, LLC performed Technology infrastructure design and Construction Administration for the same.  The project was completed in 2014 at a cost of $175,000.00
 

City Business Office & Police Department Renovation – Tandem Consulting, LLC performed as Construction Manager Advisor for the two phase renovation of the Old City Municipal Complex.  Each phase displaced City staff into temporary buildings on site.  The second phase will complete in March 2016 at a total cost of $1,250,000.00
 

Sulphur Springs ISD – Tennis Complex – Tandem Consulting, LLC performed as Construction Manager Advisor for this 8 Court Tennis Complex and Classroom.  The project was completed in 2015 at a cost of $1,800,000.00
 

Sulphur Springs ISD - Auditorium Renovation – Tandem Consulting, LLC performed as Construction Manager Advisor for the renovation of a 38 year old Auditorium.  The structure was stripped to the bones and renovated to current compliance and standards for Performing Arts.  The project was completed in June 2016 at a cost of $4,367,000.00
 

Sulphur Springs – Hopkins County EDC, Diversified Storage Manufacturing – Tandem Consulting served as Owner Representative for the construction of this new 50,000 S.F. industrial building.  The project was scheduled for completion in March 2016 at a cost of $3,000,000.00.

City of Rowlett – OSP Fiber Network – Phased design and Project Management of a MAN.
 

City of Roanoke – OSP Fiber Network – First phase design and Project Management connecting three facilities.
 

City of McKinney ITS Network – Project Management of phased intelligent traffic system fiber network.
 

Capco Communications, Inc. - OSP Metropolitan Area Networks – Tandem Consulting, LLC performs Design, Permitting and Project Management services on an ongoing basis for the following entities: Collin County, Collin College, City of McKinney, City of Frisco, City of Waxahachie, City of Plano, Frisco ISD, Melissa ISD, Wylie ISD.
 

CURRENT

 

City of Sulphur Springs Airport Fuel Farm Improvements – Tandem Consulting, LLC will perform Owner Representative duties for the City Airport.  The project includes replacement of the existing fuel farm facilities and is funded in part by TxDOT Aviation at a cost of $625,000.00.  Project will be completed October 2016.
 

City of Sulphur Springs Airport Terminal Building Renovations – Project Management for roofing replacement and toilet room renovations due to weather and moisture damage.  Project will be completed October 2016.
 

City of Sulphur Springs Library Roof replacement – Project Management for replacement of membrane roofing due to hail damage.  Scheduled completion October 2016.
 

City of Sulphur Springs PD Dispatch renovation – Project Management of a complete renovation of the dispatch room.  Scheduled completion November 2016.
 

City of Sulphur Springs Fountain redesign – Project Management of a remove, redesign and replace for the City Fountain.  Scheduled completion December 2016.
 

City of Rowlett – OSP Fiber Network 10-mile planned expansion to create a ring topology and connect additional Fire Stations.  Estimated completion January 2017.
 

City of McKinney – OSP Fiber Network – Design, Permitting and Project Management of an additional phase of the City MAN connecting a new Aquatic Center, an existing Fire Station, Library, Water Tower and multiple Traffic Control Cabinets. (Capco Communications) Scheduled completion for Nov. 2016.
 

Collin County – OSP Fiber Network – Design, Permitting and Project Management of an additional phase of the County WAN connecting a new facility.  (Capco Communications) Scheduled completion for Nov. 2016.

City of Waxahachie – OSP Fiber Network – Design, Permitting and Project Management of an additional phase of the City MAN connecting the WWTP. ( Capco Communications ) Estimated completion Dec. 2016.

NEW PROJECTS

City of Plano OSP Fiber Network – Design, Permitting and Project Management for a new MAN fiber ring, connecting 62 facilities. Preliminary project scheduled calls for a two-year phased plan. (Capco Communications)
 

Sulphur Springs – Hopkins County EDC - Ongoing prospects as they develop.

 

OTHER

 

References

Kyle F. Capps - President                              Peter Karstens – Finance Dir.                          Chris Lamb – C.I.O.

Capco Communications, Inc.                        City of Sulphur Springs                                    Wylie ISD

1142 Riley Road                                            125 S. Davis St.                                                951 S. Ballard

Whitesboro, Texas 76273                              Sulphur Springs, TX 75482                              Wylie, TX 75098

512-217-6241                                                 903-348-7875                                                  972-429-3010

[email protected]                                [email protected]                     [email protected]